EARTH PRESSURE BALANCE TBM

Efficient Tunneling Solutions for Soft & Cohesive Ground Conditions

For soft soil and clay-rich formations, the Earth Pressure Balance (EPB) Shield Machine developed by Sunward Machine provides the optimal tunneling solution. Unlike traditional methods, EPB technology uses the excavated soil itself as a plastic support medium—turning it into a paste-like material that balances earth pressure at the tunnel face. This innovative design ensures safe excavation with minimal surface settlement (≤30mm in urban areas) and enables continuous, high-efficiency tunneling, making it the first choice for urban underground projects.

Principle of Operation

  • 01
    Face Stabilization
    Maintains pressure of excavated soil in balance with surrounding ground and groundwater, preventing tunnel collapse.
  • 02
    Soil Excavation & Mixing
    Rotating cutterhead loosens soil, which enters the excavation chamber and mixes into paste-like consistency, often requiring soil conditioning (foam/bentonite).
  • 03
    Pressure Transmission
    Pressure bulkhead sends thrust from main jacks to conditioned soil, ensuring stable advance when chamber pressure matches face pressure.
Sunward Machine EPB Shield Machine

Earth Pressure Balance Shield Machine in Operation

Key Advantages (EPB TBM)

High Efficiency & Advance Rate

Maintains high advance rate (8-15m/day) in cohesive clay soils and reduces project duration.

🌍

Geological Adaptability

Suitable for mixed soft-hard formations through active soil conditioning and custom cutterheads.

Typical Applications

  • Urban Metro Tunnels and Utility Tunnels
  • Road/Railway Tunnels in Soft Ground
  • Projects requiring strict Settlement Control

Technical Excellence

Sunward Machine EPB Shield integrates advanced design and reliable intelligent control systems for optimal performance in complex geology.

Control System: Real-time pressure monitoring (up to ±0.5kPa accuracy).

Cutterhead: Wear-resistant alloy steel for long service life.

Interested in EPB Shield Solutions?

Contact Sunward Machine today for customized TBM selection and project consulting.